Because the Neugart gearbox needs to be maintained or repaired during the production process, it is sometimes necessary to disassemble the planetary gearbox in this case. Disassembly without careful preparation will cause certain damage to the parts of the planetary gearbox and affect the maintenance or repair effect. Today, I will introduce the disassembly and assembly method of the Neugart gearbox. Before disassembling the Neugart planetary gearbox, the wiring between the motor and the external electrical equipment must be removed.




1



Remove the pulley coupling


Before disassembling, make a positioning mark on the shaft end of the pulley or coupling, then loosen the tightening screws or pins of the pulley or coupling, and slowly pull down the pulley or coupling with a pulling tool. When pulling, pay attention to the force of the pulley or coupling, to ensure that the resultant force is along the axis direction, while pulling the ring. If you can't pull it out, you can penetrate the kerosene into the screw hole and pull it out. If not, you can quickly heat the pulley or coupling with a rapid fire. When heating, the pulley or coupling should be turned to make the heating even, and then pulled immediately. Pulls can also be heated if possible. When there is no tractor, you can use a wooden hammer, an aluminum hammer, a copper hammer, or you can use an iron rod as a lever, pulley, and coupling to pry it open. The position of knocking or prying should be changed along the circumference to make the force even. Generally, the shaft key is the tightest, and more force should be used.




2


Remove end caps and bearing caps


First mark the connection between the base and the end cover (to avoid errors during reassembly), loosen the fastening bolts of the end cover and the bearing cover, then remove the bearing cover, and then knock with an aluminum rod or copper rod to remove the end cover caps, but avoid excessive tapping to avoid damaging the end caps.



3


Bearing removal, cleaning and inspection


Roller bearings can be removed like pulleys or couplings. However, when disassembling, you should choose a puller of suitable size. The feet of the puller should try to hold the inner ring of the bearing as tightly as possible, and slowly pull out the bearing. When cleaning the bearing, scrape off the waste oil on the bearing and bearing cover, wash off the remaining oil with kerosene (or gasoline), and then dry it with a cleaning cloth (cotton yarn is not allowed). After cleaning the bearing, turn the outer ring of the bearing by hand to check whether it rotates freely. If stuck or loose, carefully observe the raceway surface, cage and ball or roller surface for rust, spots, etc. Bearings with rust and spots on the inner and outer raceways or on the surfaces of the balls and rollers should not be used anymore and should be replaced with new ones.




4


Assembly of planetary gearbox


The assembly steps of the planetary gearbox are opposite to the disassembly steps. Before assembly, check that there is no dust in the bearings and that the rust has been removed from each fitting. When assembling, all parts should be reset according to the markings, and the bearings should be checked for proper fit with the shaft and end caps. After assembly, twist the bearing by hand to see if it rotates flexibly and whether there is friction. If the end caps and bearing caps are not positioned correctly, or the bolts are not tightened properly, they will not work properly.






Precautions for disassembly and assembly of Neugart planetary gearbox


(1) Do not use high pressure cleaning to clean the gear planetary gearbox.


(2) The overhaul, maintenance and installation of the gear planetary gearbox are all carried out when the gear gearbox is not working.


(3) Welding work shall not be performed on the gear planetary gearbox, nor shall it be used as a welding point. Welding will render the gears and bearings irreparable.


(4) Whether there is any abnormal phenomenon (such as overheating or abnormal noise, etc.) If it is found during the operation of the gear planetary gearbox, it should be stopped immediately for inspection.


(5) All rotating parts are equipped with suitable protective covers to prevent accidental touch by installers, such as couplings, hydraulic couplings, gears, transmission pulleys, etc.


(6) Be sure to follow the instructions that come with the gear gearbox, such as the nameplate, arrows indicating the direction, etc. There must be no dust or paint on these plates and markings.


(7) Bolts damaged during assembly or disassembly must be replaced with new bolts of the same strength and type.


(8) According to the working conditions of the gear gearbox, the surface, lubricating oil and parts of the gear gearbox may reach a relatively high temperature, so be careful of scalding.


(9) When replacing the lubricating oil, be careful not to be scalded by the hot oil.


(10) The gear gearbox should be placed on a dry, vibration-free wooden base and covered. When storing the gear gearbox and any individual parts, anti-rust measures must be taken to avoid rusting. In storage, gear gearboxs must not be stacked together.


(11) Unless otherwise specified in the order contract, do not store or work in places with strong acid, strong alkali, low temperature, high temperature, serious air pollution, humidity and chemicals.


(12) When handling the gear gearbox, special care must be taken to prevent the impact shaft from breaking, as this may damage the gear gearbox. When lifting the gear gearbox, the eye bolts must not hang on the threads of the shaft end.


(13) Unless otherwise specified in the order contract, the working environment temperature should be between -25 ~ 90 ℃.


(14) The gear gearbox should be used within the allowable torque range, and a safety device should be installed on the output shaft to prevent damage to the gear gearbox.


(15) Various gear gearboxs are suitable for continuous operation and allow bidirectional operation. (unless equipped with a non-return device)


(16) If the installation direction is changed, in general, the oil mirror, oil plug and exhaust cover should be replaced, and the oil filling amount of the gear gearbox should be adjusted.

Tel: 0755-82113520, 13823217507  
E-mail: sales@sz -windrive. com  
URL: m.seisborg.com com  
Address: room 406, MaoYuan building, No. 9, Songyuan Road, Guiyuan street, Luohu District, Shenzhen  

WeChat

Links
Shenzhen Win-Drive Automation Equipment Co., Ltd.  ALL RIGHT RESERVED 粵ICP備12016317號(hào)
A级无遮挡超级高清-在线观看 | 久久天天躁狠狠躁夜夜aⅴ 日本乱中文字幕系列在线看 | 伊人久久亚洲综合色欲无码 | 日韩不卡手机视频在线观看 | 尤物99久久国产超碰精品 | 一区二区精品在线观看抖阴 | 免费动漫视频美女www一区二区三区 | 波多野结衣AV无码久久一区 | 特级BBBBBBBBB视频 | 久久精品欧美日韩精品 | 久久亚洲AV无码精品色午夜麻豆 | 午夜福利麻豆国产精品 | 亚洲AV无码专区亚洲AV | 国产亚洲综合2021在线 | 精品国产亚洲福利一区二区手机版 | 亚洲成a人在线观看中文 | 精品久久久久久无码人妻热 | 中文字幕在线一级aV片 | 欧美成人r级一区二区三区 综合激情丁香开心久久白浆 | 极品少妇高潮喷水日出白浆 | 91精品国产综合久久熟女 | 人妻妺妺窝人体色WWW聚色窝 | 欧美日韩国产日产一区二区 | 人人妻人人澡人人爽人人精品浪潮 | 亚洲一级黄片视频在线观看 | 精品国产天堂综合一区在线 | 日韩欧美国产一区二区 | 日韩欧美国产手机在线观看 | 免费无码无遮挡十八禁网站 | 黄色亚洲无码高清在线观看 | 亚洲аv电影天堂网无码 | 亚洲V国产V日韩V欧美V | 日韩爆乳一区二区无码动漫 | 欧美性猛交XXXX乱大交极品 | 亚洲国产群交无码AV | 无码专区人妻系列日韩视频 | 色欲久久久天天天综合插插 | 亚洲精品nv久久久久久久久久 | 亚洲精品中文字幕无码久久久久久 | 蜜桃永久无码一区二区三区 | 国产成年无码V片在线 |